News

Rental park expands with DELMAG RH28 drilling rig and LEFFER tool package

Tuesday, 02.07.2013

As of July 2013, an additional DELMAG RH28 drilling rig will be available for rental from our rental park ...

GDS delivers and commissions a pile rammer for Bilfinger Construction

Tuesday, 02.07.2013

GDS has delivered and commissioned a pile rammer for Bilfinger Constuction for the ”Citybanan” project ...

GDS is now a distributor for KARBO product line of drill bits

Monday, 01.07.2013

We are pleased to announce that the GDS is now distributor of Karbo's assortment of drill bits ...

Fresh Ur-Krostitzer Beer for a BBQ at the Anslutning Södra Construction Site in Stockholm

Thursday, 20.06.2013

The summer party, organised by the Anslutning Södra construction site’s management ...

New LIEBHERR LB20 drill mastered its first assignment with brilliance

Thursday, 02.05.2013

The new rotary drilling rig has completed its first rental assignment. The machine stopped by Hainichen ...

Support for the witch fire in Hainichen together with Hermanns & Kreutz

Wednesday, 01.05.2013

Together with our official shipping company ...

Meet us at the Foundation Day on March 7th!

Friday, 01.03.2013

GDS are attending the Foundation Day Show "Grundlaggningsdagen 2013", in cooperation with the SPD ...

Additional Liebherr drilling rig purchased

Friday, 15.02.2013

In February, an additional drilling rig will be added to our rental park. The Liebherr LB20, which will ...

Sunday, 10.02.2013

New casing spinner for threaded casings

Friday, 01.02.2013

During casing advancing work, uncoupling and making-up of threaded casing ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top