News

TDS at “Trenchless ENGINEERING 2014”

Tuesday, 01.07.2014

“Trenchless ENGINEERING 2014 - the 12th International Conference, Exhibition and Technology Show” ...

NEW!!! Delmag RH24 at the rental park in Hainichen

Monday, 31.03.2014

We have added an additional drilling rig to our rental park: the RH24 ...

GDS joins SPD and ABI at Grundläggningsdagen 2014

Friday, 21.03.2014

On 13 March, GDS joined the companies SPD and ABI to ...

New colleague supports rental team

Thursday, 20.02.2014

We are happy to welcome a new colleague in the rental team. And perhaps you have ...

Interoc anchor boring rigs new in our rental park

Thursday, 06.02.2014

Starting this year, we are also able to offer you Interoc anchor boring rigs for rent. Interoc is a brand of the ABI Group ...

We wish you a restful and merry Christmas!

Tuesday, 17.12.2013

2013 was a very successful year, in which we were able to both make interesting and challenging experiences ...

We’re expanding!

Wednesday, 23.10.2013

Construction on our property in Hainichen/ Saxony is in full swing. We now have additional office space ...

Frank Lörner – a new member of our service team

Tuesday, 01.10.2013

For three months now, Frank Lörner has been a member of our shop team. His duties include reconditioning rental ...

Launch of the new “Tunnel Drilling Solutions” (TDS) department

Sunday, 01.09.2013

Our company’s new “Tunnel Drilling Solutions” division is launching on 1 September 2013 ...

New RH28 rotary drilling rig put into operation

Thursday, 01.08.2013

As of recently, our new drilling rig, a DELMAG RH28 equipped with a 34t torsional rotary table ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top