Fresh Ur-Krostitzer Beer for a BBQ at the Anslutning Södra Construction Site in Stockholm

The summer party, organised by the Anslutning Södra construction site’s management, took place on 20 June 2013 in Stockholm under the best weather conditions. The short Midsommar nights made it possible to celebrate late into the night by daylight. The kegs of Ur-Krostitzer beer supplied by GDS Geo Drilling Solutions ( www.geo-drilling.com ), Scandinavian Pile Driving (www.spd.se) and BWH Bohrwerkzeuge Hoffmann (www.bohrwerkzeuge.com) ensured that nobody left the festivities thirsty. Ur-Krostitzer was deliberately chosen, since legend has it that Sweden’s King Gustav Adolf II already appreciated this beer. The construction site was provided with high-pressure pumps, Wassara and Sysbohr anchoring tools and HDI drilling (jet grouting) as early as 2012.

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top