News

The new Liebherr LB16 rotary drilling equipment has been put into operation

Friday, 04.01.2013

This brand-new LIEBHERR drilling rig LB16 will be positioned at our rental park in Hainichen ...

We wish you a blessed Advent and Christmas season.

Thursday, 06.12.2012

We cordially wish everyone a chance to relax at the end of the year, and time to reflect on that what is important ...

Mast extensions for excavators as a flexible alternative to drills

Friday, 23.11.2012

In collaboration with our partner, SRT Soil Rock Technologies, we are offering you excavator mast extensions ...

New Liebherr drilling equipment LB16 ordered

Wednesday, 05.09.2012

A brand new rotary drilling rig LB16 has been ordered shortly at the company Liebherr for use in our rental park ...

Colcrete injection unit for Entreprenørservice A/S

Wednesday, 13.06.2012

GDS delivers a complete Colcrete grout mixing unit for Entreprenørservice A/S in Norway. The mixing unit comprises ...

Water filtering unit for water powered drilling

Wednesday, 13.06.2012

GDS delivers a Ramson water filtration unit for Bauer Foundations Corp. project Center Hill Dam in the US ...

Washing area with state-of-the-art oil separator put into operation

Wednesday, 30.05.2012

A modern washing area with an effective oil separator has been put into operation at the Hainichen site a short time ago ...

… like father, like son

Tuesday, 01.05.2012

We welcome Mr Philipp Ettrich to our workshop team, which he joined in November 2011. Key part of his work is repairing ...

GDS at Grundlaggningsdagen in Stockholm

Saturday, 10.03.2012

On March 8th the Foundation Industry in Sweden held its annual conference and exhibition ...

The preparations for the company founding in Sweden are in full swing!

Thursday, 02.02.2012

As of 1 March 2012, our companies will be represented in Sweden by the company Geo Drilling Solutions AB ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top