News

We wish you a relaxing time with your loved ones!

Friday, 16.12.2011

We all are looking on a busy year 2011. We had the pleasure of sharing many positive, exciting ...

Refurbishment of the Eule Organ in the Frankenberg City Church is supported

Thursday, 01.12.2011

New colleague joins workshop team

Monday, 10.10.2011

A new colleague has been employed in order to manage our extensive workload...

Wednesday, 03.01.2007

LIEBHERR LB36 rotary drilling rig in use as of July 2016

Tuesday, 02.01.2007

Doinig things in a big way is now! The demand for increasingly larger equipment is steadily growing. For this reason we ...

GEOFLUID Drilling & Foundations in Piacenza, Italy

Monday, 01.01.2007

GDS Geo Drilling Solutions is glad to invite you to meet us at the coming GEOFLUID Drilling & Foundations in Piacenza ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top