All news

Support for the witch fire in Hainichen together with Hermanns & Kreutz

Wednesday, 01.05.2013

Together with our official shipping company ...

Meet us at the Foundation Day on March 7th!

Friday, 01.03.2013

GDS are attending the Foundation Day Show "Grundlaggningsdagen 2013", in cooperation with the SPD ...

Additional Liebherr drilling rig purchased

Friday, 15.02.2013

In February, an additional drilling rig will be added to our rental park. The Liebherr LB20, which will ...

Sunday, 10.02.2013

New casing spinner for threaded casings

Friday, 01.02.2013

During casing advancing work, uncoupling and making-up of threaded casing ...

The new Liebherr LB16 rotary drilling equipment has been put into operation

Friday, 04.01.2013

This brand-new LIEBHERR drilling rig LB16 will be positioned at our rental park in Hainichen ...

We wish you a blessed Advent and Christmas season.

Thursday, 06.12.2012

We cordially wish everyone a chance to relax at the end of the year, and time to reflect on that what is important ...

Mast extensions for excavators as a flexible alternative to drills

Friday, 23.11.2012

In collaboration with our partner, SRT Soil Rock Technologies, we are offering you excavator mast extensions ...

New Liebherr drilling equipment LB16 ordered

Wednesday, 05.09.2012

A brand new rotary drilling rig LB16 has been ordered shortly at the company Liebherr for use in our rental park ...

Colcrete injection unit for Entreprenørservice A/S

Wednesday, 13.06.2012

GDS delivers a complete Colcrete grout mixing unit for Entreprenørservice A/S in Norway. The mixing unit comprises ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top