All news

Water filtering unit for water powered drilling

Wednesday, 13.06.2012

GDS delivers a Ramson water filtration unit for Bauer Foundations Corp. project Center Hill Dam in the US ...

Washing area with state-of-the-art oil separator put into operation

Wednesday, 30.05.2012

A modern washing area with an effective oil separator has been put into operation at the Hainichen site a short time ago ...

… like father, like son

Tuesday, 01.05.2012

We welcome Mr Philipp Ettrich to our workshop team, which he joined in November 2011. Key part of his work is repairing ...

GDS at Grundlaggningsdagen in Stockholm

Saturday, 10.03.2012

On March 8th the Foundation Industry in Sweden held its annual conference and exhibition ...

The preparations for the company founding in Sweden are in full swing!

Thursday, 02.02.2012

As of 1 March 2012, our companies will be represented in Sweden by the company Geo Drilling Solutions AB ...

We wish you a relaxing time with your loved ones!

Friday, 16.12.2011

We all are looking on a busy year 2011. We had the pleasure of sharing many positive, exciting ...

Refurbishment of the Eule Organ in the Frankenberg City Church is supported

Thursday, 01.12.2011

New colleague joins workshop team

Monday, 10.10.2011

A new colleague has been employed in order to manage our extensive workload...

Wednesday, 03.01.2007

LIEBHERR LB36 rotary drilling rig in use as of July 2016

Tuesday, 02.01.2007

Doinig things in a big way is now! The demand for increasingly larger equipment is steadily growing. For this reason we ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top