Frank Lörner – a new member of our service team

For three months now, Frank Lörner has been a member of our shop team. His duties include reconditioning rental tools that have been returned to our shop after very intensive usage with a lot of wear and tear. He will also be supporting the loading and unloading of tools and drilling rigs in Hainichen.

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top