Foundation of the new Court House in Tallinn, Estonia – Successful drilling with air DTH from GDS Geo Drilling Solutions/DrillKing

For the construction of the new Court House in Tallinn, the Estonian contractor OY Mikrovai chose the 3.5’’ air DTH hammer DK 30 from GDS/DrillKing. The reason for choosing the DrillKing hammer was its well know performance; something that was showed during the project as the ROP per drilled meter was substantially higher compared to the ROP from other hammer brands.

Read more: Project Case

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top