Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top