Besab re-inforces the Liljevalchs art gallery in Stockholm with the unique Twin pump and water-propelled technology from GDS

In 2015 Besab started the sensitive ground reinforcement project of the Liljevalchs art gallery building. The work includes drilling casing advancing, RD Ø115 and RD Ø140 drilled steel casing piles for ~400 holes and is planned to end in 2017. The reason for using the water-propelled drilling technology was due to the requirements on work environment, minimization of risk of settlements as well as Besab’s experience of the technology being more cost-efficient.

For this project, the unique 720 Twin diesel pump, giving 720 lit/min @ 190 bar, from GDS was used – a pump uniquely serving two rigs in parallel, resulting in major cost savings.

Read more: Project Case

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
New in our range: R/C drilling system

We have now expanded our range with R/C drilling systems
in collaboration with our fantastic supplier Sysbohr.

26.02.2026
Follow us on social media!

You haven't missed following us on our social media?

04.03.2026
© Copyright 2026 ds. | geo drilling solutions ab
to top