GDS supplies WAI 40i hammer technology for the Chancza Water Reservoir in Poland

Commissioned by RZGW Kraków, the Polish contractor SOLEY needed to drill more than 300 drainage holes in order to prevent water filtration from eroding the body of the Chancza reservoir. A high rate of penetration (ROP) and precision drilling was needed and therefore the water-powered drilling techcnology from GDS/DrillKing was used. The project resulted in that the earth barrier was sealed off and the length of the path of it could be extended. Read more Project Case

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top