GDS supplies high pressure water pump and hammers for the sensitive construction of the Solna United office building

For the sensitive construction of the Solna United office building, more than hundred holes for installation of sheet wall were to be drilled for Skanska Fastigheter. The drillings included pre-drilling for jet-grouting, drilling for grout curtain, pre-drilling for installation of dowel as well as drilling of RD casings for anchoring. In order not to harm the sensitive jet columns, air DTH was not possible to use. The water-propelled drilling was regarded as the most benign and efficient method. Read more Project Case

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top