One man, one fjord!

BETEK equipment is being used by one of our customers in Norway at a soon-to-be-completed construction site for a new bridge. Extremely large posts are being manufactured there for a new bridge along the A18 motorway. These posts have a diameter of more than 2m and are up to 70m long. The customer’s own Liebherr-Flaggsschiff LB44 drilling rig is being used on site. The importance of painstaking, professional work in this instance was recently made evident when the E18-Holmenstrand Bridge, only half an hour’s drive away from the construction site, partially collapsed.

back
Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top