All news

LEFFER oscillator machine of the type VRM 150 KL completes the rental park

Thursday, 21.01.2016

In addition to our VRM 118 KL casing oscillator a brand-new VRM 150 KL ...

Christmas Greetings

Thursday, 17.12.2015

Who is knocking at the door?
"Oh, two very poor people!"
What do you want? ...

Successful market launch of the water-powered WAI down-the-hole-hammers on the occasion of the STUVA fair

Thursday, 03.12.2015

On the occasion of the STUVA tunnel construction fair in Dortmund the water-powered down-the-hole-hammers ...

TDS delivers drill equipment for the largest tunnel project in the world

Thursday, 15.10.2015

In the course of the selection of Qatar as the football World Cup host in the year 2022 and the strongly growing ...

Friday, 11.09.2015

From 8 to 11 September our colleagues from the Polish Eurotech Plus with their ETP Mine division exhibited at the SIMEC ...

Brand-new Liebherr LB28 drill in use in Hamburg

Friday, 29.05.2015

For approx. 2 months, our brand-new Liebherr LB28 drilling rig will be in use on a construction site in urban Hamburg ...

Liebherr LB16 in use in Oslo

Friday, 01.05.2015

The Liebherr LB16 is currently in use at a customer’s construction site in connection with a tunnel project ...

We invite you to the Grundläggningsdagen on 12 March2015 in Stockholm

Wednesday, 25.02.2015

GDS Geo Drilling Solutions, BWH Bohrwerkzeuge Hoffmann and TDS Tunnel Drilling Solutions would once again ...

One man, one fjord!

Tuesday, 17.02.2015

BETEK equipment is being used by one of our customers in Norway at a ...

Congratulations on passing your exam, Clemens!

Wednesday, 04.02.2015

The two-year training period was worth it. Today, our (ex) apprentice Clemens Hoffmann passed his wholesaler ...

Stenhuggarvägen 7C
SE-132 38 Saltsjö-Boo
Sweden

+46 (0) 70 461 06 80

info@geo-drilling.com
www.geo-drilling.com
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

17.10.2023
Aarsleff Reinforces and Piles Södertälje canal with GDS Gjutvinda

Purpose
The Södertälje canal and lock are being rebuilt to be able to handle ever larger ships. To do this, extensive foundation work is required to secure the slopes and channel bank, all so that dredging work (to deepen the channel) can be carried out.

01.06.2023
© Copyright 2024 ds. | geo drilling solutions ab
to top